{"id":383490,"date":"2022-06-27T15:30:00","date_gmt":"2022-06-27T13:30:00","guid":{"rendered":"https:\/\/innovationorigins.com\/?post_type=selected&amp;p=383490"},"modified":"2022-06-27T15:30:00","modified_gmt":"2022-06-27T13:30:00","slug":"siemens-gamesa-to-install-913-mw-of-offshore-wind-power-in-germany","status":"publish","type":"selected","link":"https:\/\/ioplus.nl\/archive\/en\/selected\/siemens-gamesa-to-install-913-mw-of-offshore-wind-power-in-germany\/","title":{"rendered":"Siemens Gamesa to install 913 MW of offshore wind power in Germany"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Siemens Gamesa is again leading the offshore revolution in Germany with a 913 MW firm order from customer \u00d8rsted. 50 km off the coast of Lower Saxony in the German North Sea, three constituent areas within the overall development contribute to the 913 MW total installed capacity, writes the company in a <a href=\"https:\/\/siemensgamesa.hosting.augure.com\/Augure_SG\/r\/ContenuEnLigne\/Download?id=E948C12E-567F-40B0-BF6B-4CD9C69B5734&amp;filename=20220627%20Borkum%20Riffgrund%203%20NoE%20press%20release.pdf\">press release<\/a>. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to the installation of the 83 offshore direct-drive wind turbines, Siemens Gamesa has been awarded a multi-year contract to service the turbines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are delighted to be again partnering with \u00d8rsted in another important offshore project. This huge wind power plant featuring our SG 11.0-200 offshore Direct Drive machines will provide both clean green energy to more than one million households for decades to come, and also make a significant contribution towards energy security for Germany,\u201d says Marc Becker, CEO of the Siemens Gamesa Offshore Business Unit.<\/p>\n\n\n<div class=\"vlp-link-container vlp-layout-basic wp-block-visual-link-preview-link\"><a href=\"https:\/\/ioplus.nl\/archive\/en\/selected\/serbia-starts-its-first-state-owned-wind-farm\/\" class=\"vlp-link\" title=\"Serbia to launch its first state-owned wind farm\"><\/a><div class=\"vlp-layout-zone-side\"><div class=\"vlp-block-2 vlp-link-image\"><\/div><\/div><div class=\"vlp-layout-zone-main\"><div class=\"vlp-block-0 vlp-link-title\">Serbia to launch its first state-owned wind farm<\/div><div class=\"vlp-block-1 vlp-link-summary\">Serbia will receive a new renewable boost in the coming years from a 66MW contract to supply state utility EPS\u2019s first wind project in the country.<\/div><\/div><\/div>\n\n\n<h3 class=\"wp-block-heading\">Installation to begin in 2024<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The installation of Borkum Riffgrund 3 is expected to begin 2024, with commissioning anticipated to be completed in 2025. The preferred supplier agreement between Siemens Gamesa and \u00d8rsted for Borkum Riffgrund 3 was announced on March 4, 2020.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The SG 11.0-200 DD machine which will be used features a capacity of 11 MW with a 200-meter rotor. It utilizes 97-meter-long Siemens Gamesa B97 blades, with a huge 31,400 m2 swept area.&nbsp;<\/p>\n","protected":false},"author":2084,"featured_media":516137,"template":"","meta":{"_acf_changed":false,"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":""},"categories":[42],"tags":[24186,128002,23429,71849,128004],"location":[24456],"internal_archives":[],"class_list":["post-383490","selected","type-selected","status-publish","has-post-thumbnail","hentry","category-sustainability-nl","tag-germany","tag-north-sea-2","tag-renewable-energy","tag-siemens-gamesa","tag-wind-power-3","location-germany"],"blocksy_meta":[],"acf":[],"featured_img":"https:\/\/ioplus.nl\/archive\/wp-content\/uploads\/2022\/05\/wind-gd1cb1c917_1920.jpg","coauthors":[],"author_meta":{"author_link":"https:\/\/ioplus.nl\/archive\/author\/mauro-mereu\/","display_name":"Mauro Mereu"},"relative_dates":{"created":"Posted 4 years ago","modified":"Updated 4 years ago"},"absolute_dates":{"created":"Posted on June 27, 2022","modified":"Updated on June 27, 2022"},"absolute_dates_time":{"created":"Posted on June 27, 2022 3:30 pm","modified":"Updated on June 27, 2022 3:30 pm"},"featured_img_caption":"","tax_additional":{"category":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/en\/category\/sustainability-nl\/\" class=\"advgb-post-tax-term\">Sustainability<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Sustainability<\/span>"],"slug":"category","name":"Categories"},"post_tag":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/germany\/\" class=\"advgb-post-tax-term\">Germany<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/north-sea-2\/\" class=\"advgb-post-tax-term\">North Sea<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/renewable-energy\/\" class=\"advgb-post-tax-term\">Renewable energy<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/siemens-gamesa\/\" class=\"advgb-post-tax-term\">Siemens Gamesa<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/wind-power-3\/\" class=\"advgb-post-tax-term\">wind power<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Germany<\/span>","<span class=\"advgb-post-tax-term\">North Sea<\/span>","<span class=\"advgb-post-tax-term\">Renewable energy<\/span>","<span class=\"advgb-post-tax-term\">Siemens Gamesa<\/span>","<span class=\"advgb-post-tax-term\">wind power<\/span>"],"slug":"post_tag","name":"Tags"},"language":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/en\/\" class=\"advgb-post-tax-term\">EN<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">EN<\/span>"],"slug":"language","name":"Tags"},"post_translations":{"linked":[],"unlinked":[],"slug":"post_translations","name":""},"location":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/location\/germany\/\" class=\"advgb-post-tax-term\">Germany<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Germany<\/span>"],"slug":"location","name":"Locations"},"internal_archives":{"linked":[],"unlinked":[],"slug":"internal_archives","name":"Internal Archives"}},"series_order":"","_links":{"self":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/selected\/383490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/selected"}],"about":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/types\/selected"}],"author":[{"embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/users\/2084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/media\/516137"}],"wp:attachment":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/media?parent=383490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/categories?post=383490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/tags?post=383490"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/location?post=383490"},{"taxonomy":"internal_archives","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/internal_archives?post=383490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}