{"id":375115,"date":"2022-05-20T12:00:00","date_gmt":"2022-05-20T10:00:00","guid":{"rendered":"https:\/\/innovationorigins.com\/?post_type=selected&amp;p=375115"},"modified":"2022-05-20T12:00:00","modified_gmt":"2022-05-20T10:00:00","slug":"serbia-starts-its-first-state-owned-wind-farm","status":"publish","type":"selected","link":"https:\/\/ioplus.nl\/archive\/en\/selected\/serbia-starts-its-first-state-owned-wind-farm\/","title":{"rendered":"Serbia to launch its first state-owned wind farm"},"content":{"rendered":"\n<p>Serbia will receive a new renewable boost in the coming years from a 66MW contract to supply state utility EPS\u2019s first wind project in the country. In fact, the Kostolac site will sit on former coal mining land, marking a fresh transition towards green energy, writes Siemens Gamesa in a <a href=\"https:\/\/siemensgamesa.hosting.augure.com\/Augure_SG\/r\/ContenuEnLigne\/Download?id=32856527-7FF2-4B2B-A266-4825713B4063&amp;filename=PR%20Serbia%20Kostolac%20ENG.pdf\">press release<\/a>.<\/p>\n\n\n\n<p>The Kostolac wind project is also a first for Siemens Gamesa in the country, which will provide 20 SG 3.3-132 turbines to this site in the east of Serbia. The turbines have a rated power of up to 3.65 MW and when installation is complete in 2024 these will be the most powerful in the country. The contract covers the turnkey construction of the wind farm including Civil and Electrical Balance of Plant with sub-station. <\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Fostering the green transition in the Balkans <\/h3>\n\n\n\n<p>For EPS, this is a major milestone in its history as the state power producer marking its first wind power project expanding its power sources beyond coal, thermal and hydro.<\/p>\n\n\n\n<p>\u201cThe deal marks many firsts for both EPS and Siemens Gamesa, and we are committed to working closely with them to ensure a successful installation. When complete, the Kostalac project will provide a huge boost to renewable power in the country helping the local economy and the energy transition in the Balkans,\u201d said Clark MacFarlane, CEO of Siemens Gamesa\u2019s NEME region.<\/p>\n\n\n\n<p>The contract was also important as it was the first wind project in Serbia financed by German development bank KfW. This is now the fourth wind park financed by KfW in the region to be implemented by Siemens Gamesa.<\/p>\n\n\n<div class=\"vlp-link-container vlp-layout-basic wp-block-visual-link-preview-link\"><div class=\"vlp-layout-zone-side\"><div class=\"vlp-block-2 vlp-link-image\"><\/div><\/div><div class=\"vlp-layout-zone-main\"><div class=\"vlp-block-0 vlp-link-title\">Decarbonizing Europe &#8211; The road to a cleaner continent<\/div><div class=\"vlp-block-1 vlp-link-summary\">Many policy documents have already spelled out that Europe must become greener and cleaner.<\/div><\/div><\/div>\n\n\n<h3 class=\"wp-block-heading\">More renewables in Serbia&#8217;s energy mix <\/h3>\n\n\n\n<p>EPS\u2019 Acting Director of Electric Power Industry of Serbia, Miroslav Toma\u0161evi\u0107, also welcomed the news. He said: \u201cThe construction of Kostolac Wind Farm represents a huge step for EPS on its way towards increasing renewable energy sources share in the generation mix and securing the energy security of Serbia. I expect that our first wind park will be constructed within the deadlines, and I am certain that the field works will start over the following months. We will continue to develop renewable energy sources projects at EPS\u2019 locations including not only wind projects but solar as well.<\/p>\n\n\n\n<p>At present Serbia has around 400MW of installed wind capacity. Wind association WindEurope expects this to grow significantly in the coming years as the government plans to hold new auctions for more renewable energy. It estimates that every turbine installed in Europe today generates around 7 million euros in economic benefits, which would have a major impact on a country such as Serbia and help to develop a local supply chain.<\/p>\n","protected":false},"author":2084,"featured_media":511114,"template":"","meta":{"_acf_changed":false,"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":""},"categories":[42],"tags":[127780,23429,71849,127782,127784],"location":[71114],"internal_archives":[],"class_list":["post-375115","selected","type-selected","status-publish","has-post-thumbnail","hentry","category-sustainability-nl","tag-eps","tag-renewable-energy","tag-siemens-gamesa","tag-wind-farms-2","tag-wind-power-2","location-serbia"],"blocksy_meta":[],"acf":[],"featured_img":"https:\/\/ioplus.nl\/archive\/wp-content\/uploads\/2022\/03\/cr3JXttE-PdSrz5dR-npBSWqZb-h8eu2E15-decarb-dossier-img4.png","coauthors":[],"author_meta":{"author_link":"https:\/\/ioplus.nl\/archive\/author\/mauro-mereu\/","display_name":"Mauro Mereu"},"relative_dates":{"created":"Posted 4 years ago","modified":"Updated 4 years ago"},"absolute_dates":{"created":"Posted on May 20, 2022","modified":"Updated on May 20, 2022"},"absolute_dates_time":{"created":"Posted on May 20, 2022 12:00 pm","modified":"Updated on May 20, 2022 12:00 pm"},"featured_img_caption":"","tax_additional":{"category":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/en\/category\/sustainability-nl\/\" class=\"advgb-post-tax-term\">Sustainability<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Sustainability<\/span>"],"slug":"category","name":"Categories"},"post_tag":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/eps\/\" class=\"advgb-post-tax-term\">EPS<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/renewable-energy\/\" class=\"advgb-post-tax-term\">Renewable energy<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/siemens-gamesa\/\" class=\"advgb-post-tax-term\">Siemens Gamesa<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/wind-farms-2\/\" class=\"advgb-post-tax-term\">wind farms<\/a>","<a href=\"https:\/\/ioplus.nl\/archive\/en\/tag\/wind-power-2\/\" class=\"advgb-post-tax-term\">wind power<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">EPS<\/span>","<span class=\"advgb-post-tax-term\">Renewable energy<\/span>","<span class=\"advgb-post-tax-term\">Siemens Gamesa<\/span>","<span class=\"advgb-post-tax-term\">wind farms<\/span>","<span class=\"advgb-post-tax-term\">wind power<\/span>"],"slug":"post_tag","name":"Tags"},"language":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/en\/\" class=\"advgb-post-tax-term\">EN<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">EN<\/span>"],"slug":"language","name":"Tags"},"post_translations":{"linked":[],"unlinked":[],"slug":"post_translations","name":""},"location":{"linked":["<a href=\"https:\/\/ioplus.nl\/archive\/location\/serbia\/\" class=\"advgb-post-tax-term\">Serbia<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Serbia<\/span>"],"slug":"location","name":"Locations"},"internal_archives":{"linked":[],"unlinked":[],"slug":"internal_archives","name":"Internal Archives"}},"series_order":"","_links":{"self":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/selected\/375115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/selected"}],"about":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/types\/selected"}],"author":[{"embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/users\/2084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/media\/511114"}],"wp:attachment":[{"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/media?parent=375115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/categories?post=375115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/tags?post=375115"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/location?post=375115"},{"taxonomy":"internal_archives","embeddable":true,"href":"https:\/\/ioplus.nl\/archive\/wp-json\/wp\/v2\/internal_archives?post=375115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}